ESP Change Workover
ESP Change Workover

According to this contract between KKC and KNGP, KKC is responsible to change 86 ESP in West Paydar and Aban field, 11 wellhead change and 1 well-pad preparation which The number of ESP changes may differ and depends on mean time between failures.

ESP First Run Workover
ESP First Run Workover

According to contract between KKC and ZNV, Karian kish is responsible to convert 24 wells from the natural flow production method to the artificial lift production method (RIH of the ESP) and 5 wells to water disposal.

ESP Lease and Repair
ESP Lease and Repair

According to this contract between KKC and KNGP, KKC is responsible to Maintenance and operation installed ESP (full set), after the failure the ESP the KKC shall Rent ESP equipment (down-hole, cable line) the Contractor furnished equipment with Maintenance and operation services, repair ESP equipment and Design and Selection of down-hole and surface ESP equipment.

Material Provision
Material Provision

According to this contract between KKC and ZNV, Karian kish si responsible to provide 44 set of wellhead and Xmas tree, 113 KM tubular and 44 set of ESP for running in west Paydar and Aban field.